Oil and Gas

If you’d like to talk to us about a project, or anything else, we’d love to hear from you.

Oil and Gas

 
  • Construction of BP Headquarter in Rumailah, Basra-South of Iraq, Concrete Structure with over all services and high quality finishing for HQ Building (G+1F), Accommodation (G+F1) Buildings, Concrete Structure, Parking Building (G+F1), Bank, Terminal Building, Check Points, Driver Lounges Buildings, Power Plant, WTP, STO, Roads and Landscaping, Overall Built up area about 67,000 m2 , Concrete more than 70K m2.
  • Engineering, Procurement, Construction and Commissioning of Power Supply System for Iraq Halfaya Oil Field Temporary Camp & CPF1.
  • All earth works, roads, trenches, towers and fencing to accommodate Shell staffs for Majnoon oilfield development activity.
  • Bunch of different activities of Earth Works, Buildings, Roads, and Fencing Works, Supply Plants for Solid Waste Dumping executed for Shell Iraq Petroleum Development B.V.of Majnoon Oil Field-Basra South of Iraqin detailed contracts of SIPD-702 / SIPD-703, SIPD-793, SIPD-760, SIPD-384, SIPD-498, and SIPD-637.
  • Bunch of different activities of Earth Works, Buildings, Roads, and Fencing Works, Supply Plants for Solid Waste Dumping executed for CNOOC Iraq B.V Bazurkan Oil Field Missan Province- South of Iraq.
  • Engineering, Procurement, Construction and Commissioning of Power Supply System for Iraq Halfaya Oil Field Temporary Camp & CPF1 / PetroChina Co. Ltd. Iraq Branch ( Halfaya )
  • All earth works, roads, trenches, towers and fencing to accommodate Shell staffs for Majnoon oilfield development activity as multiple activities of Erath works and Road works for Majnoon Oilfield Development Contract SIPD/PETR/2010012.