- Piling works and civils on site to instruct and pave stage (2) of Kardiyah highway bridge including status & ecomm. actions for rehabilitation with issuance of auto-cad drawings and overall reports.
- Piling and civil works on site to Supply materials and putting up the pillars of Abu Dshir, Transformation Station-132 KVA.
- Pilling and civils to construct Headquarter in Rumailah, Basra-South of Iraq, Concrete Structure with over all services and high quality finishing for HQ Building (G+1F), Accommodation (G+F1) Buildings, Concrete Structure, Parking Building (G+F1), Bank, Terminal Building, Check Points, Driver Lounges Buildings, Power Plant, WTP, STO, Roads and Landscaping, Overall Built up area about 67,000 m2 , Concrete more than 70K m2.